Log In Register

Reacting to customer needs

What’s the biggest influence on machine control design? Check out our Web Poll results and find out just what it is that customers demand. Then take the new Web Poll on cycle time requirements.

02/10/2005

1 vote
Text size: - +

ControlDesign.com's previous Web Poll results


Responders' comments:


  • “The operators need more help than ever.”
  • “With tightened IT budgets, fast commissioning is a key deciding factor in choosing support hardware and software, as long as the functional requirements are met and we're not designing ourselves into a corner.”
  • “My customers have to do more different products with the machines today.”
  • “Everything needs to be ‘idiot proof’ due to what seems to be a less trainable work force.”
  • “Information rules.”
  • “The customer wants faster commissioning. Easier reconfiguration is dependent on system age. All suppliers are trying to improve diagnostics and troubleshooting. Those are some of the factors listed here that are part of my choice of guaranteed performance.”

Take the new poll on ControlDesign.com (at left) and answer the following questions regarding cycle time requirements:

ADVERTISEMENT


  1. What are your cycle time requirements?
  2. If fast response is more important, how fast is the required response?
  3. If repeatable response is more important, what is the maximum allowable response time?
1 vote

ControlDesign.com is the only multimedia source dedicated to the controls, instrumentation, and automation information needs of industrial machine builders, those original equipment manufacturers (OEMs) that build the machines that make industry work.

Most Popular Check out the most popular content on ControlDesign.com, as determined by our visitors.

  1. #1Encoder Resolution for the Taking
  2. #2Zombie Survival Guide
  3. #3How to Raise Motor Efficiency
  4. #4Is PLC a Dirty Word Now?
  5. #5Green Is No Gamble