Control system design commitment

Dec. 7, 2011

As we commit our control system design to include digital networks rather than hardwired I/O, we want to be sure about reliability and know where redundant network devices are most needed, even if we specify hardened devices for many of the components. We worry that adding unnecessary network complexity and cost will give us after-sales support headaches. We'd like some seasoned advice.

As we commit our control system design to include digital networks rather than hardwired I/O, we want to be sure about reliability and know where redundant network devices are most needed, even if we specify hardened devices for many of the components. We worry that adding unnecessary network complexity and cost will give us after-sales support headaches. We'd like some seasoned advice.

Sponsored Recommendations

IDEC Push-In Terminals make control panel wiring quicker and easier

Push-in terminals simplify the wiring of control panels for equipment manufacturers that have many control devices in the panel. The push-in terminal also reduces manufacturing...

Addressing Harsh Environmental Challenges with Technology

Discover why rugged HMI technology is crucial for enhancing machine performance and reliability in harsh environments. Learn about our high-quality, certified solutions designed...

2024 State of Technology Report: Motors, Drives & Motion

Motion makes manufacturing move. Motors and drives are at the core of industrial operations. Without them, production comes to a halt. This new State of Technology Report from...

Case Study: Conveyor Solution for Unique Application

Find out how the Motion Automation Intelligence Conveyor Engineering team provided a new and reliable conveyance solution that helped a manufacturer turn downtime into uptime....