The 4 cornerstones of effective I/O checkout

The importance of proper I/O checkout and commissioning plans to prevent residual failures

During commissioning and after, if you hear three definitions of I/O checkout and then get residual failures after a down and an install because no one is going off a commissioning plan, writing up a test plan or adhering to a commissioning plan, then there is a problem.

In this episode of Control Intelligence, written by contributing editor Tobey Strauch, editor in chief Mike Bacidore discusses machine commissioning and I/O checkout.

About the Author

Control Intelligence

Control Intelligence

A Control Design Podcast

Control Intelligence is a Control Design podcast that goes deep inside the automation and technology that machine builders, system integrators and end users rely on to keep production humming efficiently. New episodes come out every Monday, and download all episodes by Apple Podcasts or Podbean.

Sign up for our eNewsletters
Get the latest news and updates