1660319314869 7riskassestment

Infographic: When Planning a Safety System Do You Conduct a Risk Assessment Analysis?

Dec. 10, 2013
74.2% of Respondents Report Conducting a Risk Assessment Analysis

An electronic survey of Control Design readers was conducted in October 2013 in order to identify usage and application trends of machine safety among the industrial machine builders that comprise Control Design's readership.

The majority of respondents (74.2%) conduct a risk assessment analysis before planning a safety system; 25.8% do not.

See all survey results.

Sponsored Recommendations

Automation technology continues to advance the capabilities of packaging equipment.This new State of Technology Report from the editors of Control Design covers the ways packaging...
Protecting processes from explosive risks is a matter of life and property. Ensure electrical safety in hazardous locations by installing solutions certified to IEC and NEC standards...
Transform your machine's safety system. Discover how to upgrade with configurable products, scalable designs, and simplified wiring for improved diagnostics and long-term reliability...
Unlock the benefits of ASi with our Engineer’s Guide: Learn how to reduce wiring, cut costs, and improve flexibility in your automation systems.